Everything Mary
Everything Mary Clear 16-Drawer Organizer – Wall-Mountable Plastic Storage Cabinet for Crafts, Jewelry, Beads & Small Parts
Everything Mary Clear 16-Drawer Organizer – Wall-Mountable Plastic Storage Cabinet for Crafts, Jewelry, Beads & Small Parts
Couldn't load pickup availability
Keep creativity organized with the Everything Mary Clear 16-Drawer Organizer, a versatile storage cabinet perfect for craft rooms, sewing studios, and workshops. With 16 transparent drawers, you can easily sort and see beads, buttons, screws, jewelry findings, or office supplies at a glance. Its compact design fits on desks, shelves, or can be mounted to a wall for space-saving convenience. Made from a durable blend of polypropylene and polystyrene, this sturdy organizer delivers both clarity and reliability for everyday use.
- 16 CLEAR DRAWERS – Perfect for beads, jewelry findings, office supplies, or small hardware parts.
- WALL-MOUNTABLE OR DESKTOP USE – Flexible design for use on craft tables, shelves, or walls.
- DURABLE BUILD – Made from 40% polypropylene and 60% polystyrene for long-lasting performance.
- COMPACT, SPACE-SAVING SIZE – Exterior dimensions 8.8" L × 3.4" W × 5.6" H; ideal for tight workspaces.
- TRANSPARENT DRAWERS – Instantly see and access your supplies without opening every drawer.
Stay tidy, creative, and inspired with Everything Mary – where smart design meets crafting ease.
